Transmission System Development:

ACTION ALREADY TAKEN FOR MINIMIZATION OF TRANSMISSION LOSSES :

  • 1. Major part of old 66-KV lines along with 66 KV transformation capacities will be upgraded to 132-KV with establishment of New Substations.

  • 2. Replacement of existing old and de-rated 66 KV network by upgrading to 132 KV level throughout the State.

  • 3. Improvement of Reliability, Voltage Profile & Future Load Management by replacement of old existing conductor (where mechanical strength have been deteriorated) by providing HTLS conductor.

  • 4. Replacing obsolete/old aged switch gears and unreliable electromechanical protection relays by numerical relays.

  • 5. Installation of Distance Protection Relays.

  • 6. Establishing 132 KV link to develop ring-main in the system.

  • 7. New Capacity addition and augmentation of transformation capacity adequately to meet up present and future load growth.

  • 8. Weakest areas in the transmission system and strengthening by improving them so as to draw the maximum benefits.

  • 9. To facilitate increased availability of power to the consumers, improve service delivery, and reduce system losses.